Buildings

SK8

Constructed:2008
Architects:Cohlmeyer Architecture
5468796 Architecture

More Information

The SK8 kiosk, built to accompany the skate park, was originally designed to be both temporary and seasonal. The project consists of two phases, the open-air kiosk and the enclosed storage and repair shop.

The phase I kiosk began as a simple exercise to create a structure that could be disassembled and would require a minimal amount of connections during its erection. While all of the components for the structure are custom manufactured, the play of creating volume and enclosure from the modular and easy-to-manufacture pieces remain evident in the final product. The quarter-inch-thick, one-foot-wide aluminum plates create a simple interlocking egg crate structure that has enough strength to span as a roof or a wall, but also to function as shelving for the store merchandise. The enclosed volume is metaphorically ‘pulled apart’ to allow for access points into the 3.6 × 4.8 metre kiosk.

The phase II structure acts as a companion piece to the original frame. The one-foot module continues, but the aluminum structure is now expressed on the inside and clad with cellular plastic panels on three of its exterior faces.

Design Characteristics

Materials:Aluminum
Size:1000 square feet